NADIA BHUIYAN
Associate Professor
Department of Mechanical and Industrial Engineering
Concordia University
1455 de Maisonneuve Blvd. West
Montreal, Quebec H3G 1M8, Office: EV.12.105
Tel.:  514-848-2424 ext. 3101
Fax: (514) 848-3175
Email: bhuiyan@alcor.concordia.ca

Associate Director
Concordia Institute for Aerospace and Design Innovation (CIADI)
http://ciadi.concordia.ca
1515 St. Catherine St. West EV12.101
Montreal, Quebec, Canada
Tel.: 514-848-2424 ext. 7905


Academic background

Employment and Activities

Research Contributions and Practical Applications



Book

  1. Salam, A., Bhuiyan, N., Raza, A., and Gouw. G. (2008) Measuring Design Effort in Product Development, VDM Verlag.


Book Chapter

  1. Contribution to Les carrières d'avenir 2010 des Éditions Jobboom (January 2010).

  2. Contribution to Technically Speaking, for Éditions du Renouveau Pédagogique Inc. ERPI, 2007.

  3. Bhuiyan, N., Baghel, A. (2006) History, Evolution and Hybrids of Continuous Improvement Methodologies, in Managing Innovation and Change (3rd edition), edited by David Mayle.


Articles in refereed publications

  1. Bhuiyan, N., Gerwin, D., Thomson, V., A Comparison of Analytic, Statistical and Simulation Models for Organizing the New Product Development Process, submitted to IEEE Transactions of Engineering Management, accepted for publication, 2011.

  2. Bhuiyan, N., Gouw, G. and Bagherzadehyazdi, D. Scheduling of a computer integrated manufacturing system: a simulation study, submitted to Journal of Industrial Engineering and Management, accepted for publication, 2011.

  3. Agrawal, A. and Bhuiyan, N. A Framework for Successful New Product Development, Journal of Industrial Engineering and Management, accepted for publication, 2011.

  4. Khan, S., Girard, P., Bhuiyan, N., Thomson, V. Improved Mathematical Modeling for the Sheet Reheat Phase in the Thermoforming Process, submitted to Polymer Engineering & Science, accepted for publication, 2011.

  5. Briard, R., Bhuiyan, N., and Sicotte, H. Success Factors in New Product Development Projects in a Weak Matrix Structure: An Aerospace Case Study, submitted to International Journal of Project Management, accepted with revisions, 2011.

  6. Othman, M., Bhuiyan, N. and Kong, L. 2011. Developing a Dynamic Wheelchair using the Design Structure Matrix Method, submitted to Concurrent Engineering Research and Applications, vol. 19(3) pp. 235-243.

  7. El Sabbagh, H. and Bhuiyan. 2011. N. A Lifecycle Model for Airborne Safety-Critical Software, Software Quality Professional, 13(3).

  8. Beauregard, Y., Bhuiyan, N., and Thomson, V. 2011. Post-certification engineering taxonomy and task value optimization in the aerospace industry, Engineering Management Journal, 23(1), pp. 86-100.

  9. Bhuiyan, N., Thomson, V. (2010) A Framework For NPD Processes Under Uncertainty, Engineering Management Journal, 22(2), pp. 27-35.

  10. Attar, A., M.A. Boudjakdji, N. Bhuiyan, K. Grine and S. Kenai. (2009) Integrating Numerical Tools in Underground Construction Process, Engineering, Construction and Architectural Management, 16(4) pp. 376-391.

  11. Kong, L., Bhuiyan, N. and Thomson, V. (2009) The Value of Organizational Structures, Concurrent Engineering and Research Applications, 17 (1) pp. 61-72.

  12. Kong, L., Bhuiyan, N. and Thomson, V. (2008) Determining the Value of Sequential and Concurrent NPD Processes, Concurrent Engineering and Research Applications, 16(3) pp. 201-211.

  13. El Sabbagh, H. and Bhuiyan, N. (2008) A Quality Assurance Model for Airborne Safety-Critical Software, Total Quality Management and Business Excellence Journal, forthcoming.

  14. Salam, A.M., Bhuiyan, N.F., Gouw, G.J, and Raza, S.A. (2008) Estimating Design Effort for the Compressor Design Department: A Case Study at Pratt & Whitney Canada. Design Studies, 30(30, pp. 303-319.

  15. Beauregard, Y., Bhuiyan, N., and Thomson, V. (2008) Lean Engineering in Product Development, Canadian Aeronautics and Space Journal, 54(2) pp. 19-30.

  16. Salam, A. M., Bhuiyan, N. F., Gouw, G. J., Raza, S. A. (2008) A Case Study to Estimate Design Effort for Pratt & Whitney Canada, International Journal of Management Science and Engineering Management, 4(3), pp. 284-293.

  17. Attar, A. Bhuiyan, N., and Thomson Journal of Materials Processing Technology, V. (2008) Manufacturing in blow molding: Time reduction and part quality improvement, 204 (1-3) pp. 284-289.

  18. El Sabbagh, H. and Bhuiyan, N. (2007) A Quality Assurance Model for Airborne Safety-Critical Software, Total Quality Management and Business Excellence Journal, forthcoming.

  19. Bhuiyan, N., Gatard, G., Thomson, V. (2006) Engineering Change Request Management in a New Product Development Process, European Journal of Innovation Management, 9(1) pp. 5-19.

  20. Bhuiyan, N., Thomson, V., Gerwin, D. (2006) A Systematic Framework for Implementing Concurrent Engineering, Research-Technology Management, 49(1) pp. 38-43.

  21. Bhuiyan, N, Baghel, A., Wilson, J. (2006) A sustainable continuous improvement methodology at an aerospace company. International Journal of Productivity and Performance Management, 55(8) pp.671-687.

  22. Bhuiyan, N., Baghel, A. (2005) History, Evolution and Hybrids of Continuous Improvement Methodologies, reprinted in The Journal of Enterprise Resource Management.

  23. Shuiabi, E., Thomson, V., Bhuiyan, N. (2005) Entropy as a Measure of Operational Flexibility, European Journal of Operational Research, 165(3) pp. 696-707.

  24. Bhuiyan, N., Alam, N. (2005) A Case Study of a Quality System Implementation in a Small Manufacturing Firm, International Journal of Productivity and Performance Management, 54(3) pp. 172-186.

  25. Bhuiyan, N., Baghel, A. (2005) History, Evolution and Hybrids of Continuous Improvement Methodologies, Management Decision, 43(5) pp. 761-771.

  26. Bhuiyan, N. and Alam, N. (2005) An Investigation Into Issues Related to the Latest Version of ISO 9000, Total Quality Management and Business Excellence, 16(2) pp. 199-213.

  27. Bhuiyan, N., Gerwin, D., Thomson, V. (2004) Simulation of the New Product Development Process for Performance Improvement, Management Science, 50(12) pp. 1690-1703.

  28. Bhuiyan, N., Alam, N. (2004) ISO 9001:2000 Implementation: the North American Experience, International Journal of Productivity and Performance Management, 53(1) pp. 10-17.

  29. Bhuiyan, N., Thomson, V. The Use of Continuous Approval Methods in Defence Acquisition Projects. International Journal of Project Management, Vol. 17, No. 2, pp. 121-130, December, 1997.


Other refereed contributions

  1. Gill, G. S., Vidyarthy, N., Bhuiyan, N. Step towards Environment Friendly Closed Loop Supply Chain, 2012, accepted for the 4th Annual Translog 2012 Conference, Hamilton, Ontario.

  2. Defersha, F., Salam, A., and Bhuiyan, N. Product Cost Estimation using Supper Efficiency Data Envelopment Analysis, 2011 International Conference on Uncertainty Reasoning and Knowledge Engineering (URKE), Bali, Indonesia, August 2011.

  3. Beauregard, Y., Bhuiyan, N. and Thomson, V. Optimum task size, multitasking and utilization levels for lean product development, Industrial Engineering Research Conference, part of the IIE Annual Conference, Reno, Nevada, May 2011.

  4. Othman, M., Bhuiyan, N. and Gouw, G. A New Approach to Workforce Planning, ICMAME 2011: International Conference on Mechanical, Aeronautical and Manufacturing Engineering, Venice, Italy, April 27-29, 2011.

  5. Amirjabbari, B. and Bhuiyan, N. An Application of a Cost Minimization Model in Determining Safety Stock Level and Location, ICMIE 2011: International Conference on Mechanical, and Industrial Engineering, Paris, France, July 27-29, 2011.

  6. Othman, M., Bhuiyan, N. and Kong, L. Application of the Design Structure Matrix in Wheelchair Development, International Conference on Engineering and Operations Management (IEOM 2011), Kuala Lampur, Malaysia, January 2011.

  7. Briard, R., Bhuiyan, N., Sicotte, H. Critical Success Factors in New Product Development Projects in a Weak Matrix Structure, International Conference on Mechanical and Industrial Engineering (ICMIE 2010), Singapore, August 2010.

  8. Beauregard, Y., Bhuiyan, N., Thomson, V. Engineering task management policies influence on product development performance, Industrial Engineering Research Conference (IERC) 2010, part of the IIE Annual Conference 2010, June 2010, Cancun, Mexico.

  9. Salam, A., Defersha, F.M., Bhuiyan, N. and Chen, M. A Case Study on Target Cost Estimation using a Genetic Algorithm and a Back Propagation Based Neural Network, IEEE International Conference on Engineering Systems Management and Applications, (ICESMA'10), Sharjah, UAE, 2010.

  10. Salam, A.M., Bhuiyan, N, Gouw, G, and Raza, S A, Estimating Design Effort to Manage Resources within a Supply Chain: A Case Study at Pratt & Whitney, Conference proceeding for the 6th Annual International Symposium on Supply Chain Management, Calgary, Alberta, Canada, Oct. 2008

  11. Beauregard, Y., Thomson, V., Bhuiyan, N., 2007. Lean Engineering Logistics – Load Leveling of Design Jobs with Capacity Considerations, 2007 Canadian Aeronautics and Space Institute Annual General Meeting Aircraft Design and Development Symposium.

  12. Beauregard, Y., Bhuiyan, N., Thomson, V., 2007. Lean Engineering Logistics Systems for Product Development in the Aerospace Industry, Proceedings of the 2008 Industrial Engineering Research Conference, J. Fowler and S, Mason, eds.

  13. Beauregard, Y., Bhuiyan, N. Thomson, V. Lean Engineering In Product Development, SME Conference in Lean Engineering, 2007.

  14. Salam, A.M., Bhuiyan, N.F., Gouw, G.J, and Raza, S.A., Estimating Design Effort in Product Development: A Case Study at Pratt & Whitney Canada, Proceedings of the IEEE International Conference on Industrial Engineering and Engineering Management (IEEM07-P-0254), Singapore, Dec. 2007

  15. Hong H., Hoa S.V., Bhuiyan N., Siddiqui K. and Pugh M. Capstone Design Projects at the Department of Mechanical and Industrial Engineering At Concordia University, The Second CDEN International Conference on Design Education, Innovation, and Practice, Kananaskis, Alberta, Canada, July 18-20, 2005.

  16. Kong, L., Yu, X., Bhuiyan, N. ‘Aider’: A Modular Addition to Transform a Manual Wheelchair into an Electrical Wheelchair, RESNA's 28th International Conference, Hyatt Regency, Atlanta, GA, June 25-27, 2005.

  17. Yu, X., Bhuiyan, N., Kong, L., Application of the Design Structure Matrix for a Motorized Wheel, Industrial Engineering and Systems Management-IESM05 Marrakech, Morocco, May 2005.

  18. Bhuiyan, N., Alam, N. An Empirical Study on Issues Surrounding ISO 9000 Implementation, 33rd International Conference on Computers & Industrial Engineering, Korea, March 25-27, 2004.

  19. Agrawal, A., Bhuiyan, N., Critical Success Factors and Metrics for New Product Development Success, International Industrial Engineering Conference, Amirkabir University of Technology and Iran Institute of Industrial Engineering, Iran, July 2004.

  20. Bhuiyan, N., Baghel, A. History, Evolution and Hybrids of Continuous Improvement Methodologies - A Decision-Making Tool for CI Implementation, 33rd International Conference on Computers & Industrial Engineering, Korea, March 25-27, 2004.

  21. Shamsuzzoha, A. and Bhuiyan, N., Simulation Experimenter: An Expert Support System for Simulation Experiment Design And Analysis, ICME 2003 Dhaka, Bangladesh University of Engineering and Technology (BUET), 26-28 December 2003.

  22. Bhuiyan, N., Thomson, V., Jafaar, R., The effects of communication on CE processes, CERA2003, Portugal, July 2003. Bhuiyan, N., Thomson, V., Gerwin, D., Implementing Concurrent Engineering: A Case Study, CERA2003, Portugal, July 2003.

  23. Bhuiyan, N., Alam, N., Implementation of ISO 9000 Systems: A Study of Canadian Companies, 31st International Conference on Computers & Industrial Engineering, August 2003, Ireland.

  24. Bhuiyan, N., Kong, L., Thomson, V. A Comparison of New Product Development Processes Using a Decision-Theoretic Approach, 2002 International Conference on Comparative Management, May 2002, National Sun Yat-sen University, Kaohsiung, Taiwan.

  25. Bhuiyan. N, Thomson, V. Designing New Product Development Processes For Success Through The Use Of Stochastic Computer Models, 30th International Conference on Computers & Industrial Engineering, June 2002, Tinos Island, Greece.

  26. Bhuiyan, N., Awareness of Gender Inequity in Engineering, 12th International Conference of Women Engineers and Scientists Women in a Knowledge-Based Society, July 2002, Carleton University, Ottawa, Canada.

  27. Bhuiyan, N., Kong, L., Thomson, V., A Decision-Analytic Approach to Evaluating Concurrent Processes, CSME, November 2001, Taiwan.

  28. Bhuiyan, N., Thomson, V., Gerwin, D., Evaluating the Performance of Concurrent Processes, ICC&IE, November 2001, Montreal, Canada.

  29. Bhuiyan, N., V. Thomson, D. Gerwin. Evaluating the Performance of Concurrent Processes, 7th ISPE International Conference on Concurrent Engineering Research Applications, University Lyon I, Lyon, France, July 2000, pp. 157-164.

  30. Attar, A., Bhuiyan, N. et al, Reduction of Part Development Time Through Simultaneous Process and Information Modeling, ANTEC Conference, May 2000, Florida.

  31. Bhuiyan, N., Thomson, V., Simulation Of Concurrent Engineering Processes, International Conference on Industrial Engineering and Production Management, July 1999, Glasgow, Scotland.

  32. Attar, A., Bhuiyan, N. et al. (June 4, 1999) Methodologies for rapid product development in blow moulding. 22nd SIGBLOW Meeting, National Research Council Canada, Industrial Materials Institute, conference presentation.

  33. Bhuiyan, N., Thomson, V., Formalizing and Evaluating the Concurrent Engineering Process, Proceedings of Canadian Society for Mechanical Engineering (CSME) Forum 1998, Vol. 3, pp. 1-6, May 1998.

Non- refereed Publications

  1. Salam, A, Bhuiyan, N, Defersha M D, Supply Chain Management: Case Studies to Estimate Design Effort and Target Costs, Conference presentation for the Third Annual Supply Chain Management Doctoral Students Colloquium, Calgary, Alberta, Canada, Oct. 2008.


Honours and Awards