Group |
2020-16 |
Status |
completed |
Title |
Installation of an ATSC 3.0 Broadcasting Link |
Supervisor |
Reza Soleymani |
Description |
The objective of this project is to establish a TV channel using the new North American standard ATSC 3.0. We have already an ATSC 3.0 receiver and we can buy a transmitter. We can do the initial development using cable (from transmitter to receiver) to avoid transmitting on someone else band.
The project involves the following Tasks:
1. Study of ATS 3.0 standard.
2. Simulation of the system.
3. Establishment of the ATSC 3.0 link and testing the transmission of the programs.
4. Developing an APP for viewing TV on the mobile.
5. Writing the report.
6. Demonstration.
|
Student Requirement |
Background courses: Digital Comms, Software Programming,
|
Tools |
Hardware: ATSC 3.0Transmitter and Receiver, PC.
Software: Standard packages such as Matlab and C compiler.
|
Number of Students |
3 or 4 |
Students |
Nicolas Moncada
Mehrooz Ahmed
Ahmed Dawoud
Mohamed Nejjari |
Comments: |
Email: msoleyma@ece.concordia.ca |
Links: |
|